Recovery rate according to a building

 2005'
 2004'
 2003'
 2002'
 2001'
 2000'

A calculation method of recovery rate

            Quantity of recovery
 Recovery rate=                             
            Quantity of supply−( End of the month stock − Beginning of the month stock )

※ Recovery rate is calculated as purity of recovery gas is 100%.

▼  Year of 2005

January Recovery rate report

■Helium Gas recovery rate, according to a ridge. [time period (1/11)〜(2/7)]

Place Quantity of recovery Quantity of supply Beginning of the month stock End of the month stock Quantity of loss recovery rate(%)
Total of Kashiwa campus 8366.1 10791.5 3951.3 4114.3 2262.4 78.7
ISSP Main Building 4457.2 5486.9 1965.2 1798.5 1196.4 78.8
ISSP Low temp.and High Pressure lab. 2139.4 3019.4 1146.9 1428.7 598.2 78.1
ISSP Advanced Spectroscopy 470.9 477.4 370.1 356.5 20.1 95.9
Frontier Sciences Transdisclipnary Sciences 1284.5 1736.1 344.4 377.8 418.2 75.4
Frontier Sciences Intergrated Biosciences 14.1 71.7 124.7 152.8 29.5 32.3

(Unit of Quantity of recovery, Quantity supply, Quantity of stock are term of m3 )

Recovery rate of this month was 78.7%

※The building of Low temperature and Highly pressure Lab. are located right next to each other .So the recovery rate is combined together and calculated.


Back to Ekikashitu HP