Welcome to SANS-U, NLS-ISSP, U. Tokyo.
In 2011, SANS-U operation will start from the 2nd cycle due to instrallation of super-mirror to C3 guide line.
From FY2010, we have two categolies, Accepted and Suspended. Reservation is available three weeks in advance (Accepted proposal) and one week for Suspended Proposals
Reservation can be made to mail to SANS-U webmaster.
Evaluation of Incoherent Scattering Intensity by Transmission and Sample Thickness,
J. Appl. Crystallogr., 2009, 42, 621-628.
Current Status of the 32 m Small-angle Neutron Scattering Instrument, SANS-U
Nuclear Inst. and Methods in Physics Research, A, 2007, 572, 853-868.
Upgrade of the 32 m Small-angle Neutron Scattering Instrument, SANS-U
J. Appl. Cryst., 2005, 38, 1035-1037.
Beam time schedule, 2011
Beam time schedule, 2010
Designed by CSS.Design Sample